Post-production bottling
← Back to all checklists-
-
#1 Turn off de-pal table
Last completed Sat, May 31st @ 8:45 a.m.
-
#2 Cover bottle pallet remaining on De-Pal w/ slip sheet
-
#3 Turn off compressed air to Down Bottle Ejector
-
#4 Put bottle pallet ID labels on Line Operator's clip board
-
#5 Cover bottles on conveyor with shrink film
-
#6 Return ladders to boiler room
-
#7 Clean off De-Palletizer Grippers
-
#8 Sweep operator's platform
-
#9 Check for and remove debris on de-pal storage rack
-
#10 Wipe down DePalletizer and control panel with Simple Green
-
#11 Vacuum inside of DePalletizer
-
#12 Dump first 4 cases
-
#13 Mop DePalletizer operator's platform
-
-
-
Take six-packs to library - 1 cold, 1 warm
-
Clean change parts with DART-444 and place on Change Parts Cart
-
Return any unused labels to Label Room
-
Take 6-pack holders to label room
-
-
-
#1 Sweep up debris around pallet stacks
-
#2 Sweep around and under Slitter/Sealer
-
#2 Sweep around and under Depal
-
#4 Clean off Slitter/Sealer tape cutter teeth (Caution, the blade is very sharp)
-
-
-
#1 Take all shorties to walk-in cooler
-
#2 Take empty cases to TR
-
#3 Check and clear case packer of all bottles, labels, etc.
-
#4 Visually check no bottles in Filler reject tray
-
#5 Visually check no down bottles in Case Packer infeed
-
#6 Clean bottom of Case Packer Product Brakes with Isopropyl Alcoholi
-
#7 Wipe down bottling scales and table w/ Simple Green
-
#8 Wipe down Case Packer conveyer w/ Simple Green
-
#9 Wipe down Crown Cap hopper w/ Simple Green
-
#10 Wipe down Labeler carousel and base with Simple Green
-
#11 Vacuum out Labeler of any broken glass if necessary
-
#12 Sweep under case packer, remove debris from conveyor
-
#13 Wipe off exterior of plexiglass shield at Case Loader exit
-
#14 Clean Drip pans with Dart 444 hand pump then rinse
-
#15 Empty and rinse Case Packer drain bucket
-
-
-
#1 Mop Front and back of Filler (including by lube station)
-
#2 Mop under/around all bottle conveyors
-
#3 Mop Around Case Packer
-
#4 Return brooms, mops, etc to storage location
-
#5 Dump Bottling Line Trash and Recycling cans then rinse out with hose and return to line
-
#6 Final walk through, remove rags and misc. items
-